Harold’s green credentials were called into doubt last night, as the controversial village wind turbine finally ran out of puff.
Despite the vast cost of the equipment and 3 years of legal wrangling with local pressure groups, the windmill was only operable for 40 minutes before an engineer had to be called.
Norwegian wind experts Flattus were quickly on the scene and proceeded to remove panels from the lower sections of the tower. But a quick-eyed junior cameraman from the Evening Harold snapped the guts of the equipment, revealing an estimated 40,000 AA batteries being used to power the fan.
Continue reading
You must be logged in to post a comment.