People in Harold have raised several objections to a high-speed bus route that will pass through the village.
‘High Speed Bus 2’ is intended to be a replacement for the original HSB, which was written off after supposedly sliding on discarded kebab meat. Remnants of that project can still be seen in a ditch just outside Harold, the coachwork heavily peppered with buck shot. Accident investigators are still divided on the incident.
“Harold doesn’t need a slightly faster bus service”, insisted Councillor Ron Ronsson. “Particularly as the bloody thing won’t even stop here.” Connecting the hamlet of Felching to the bus depot in Dunstable, Ronsson claims the case for a 3,000 horsepower bus is yet to be made.
You must be logged in to post a comment.